Pavimentos Prefabricados de Hormigón

Erwin Kohler

Seminario Innovación en Pavimentos Interurbanos de Hormigón

Prefabricados de Hormigón? • Productos prefabricados :

– tuberías – Elementos de puentes – Barreras – Soleras – Muros de retención – Incluso amoblado!

• Uso va aumentando

• Todo están contentos

con prefabricados

3

Por qué pavimentos prefabricados?

• Losas con buen hormigón menos grietas – Condiciones controladas, fábrica – Ya han ganado resistenacia al abrir al tráfico

• Instalación Rápida cierres de pista cortos

– “Trabajo Invisible” • Construcción sólo de noche, o trabajo de fin-de-semana

– Menos demoras de los usuarios • Consumo de combustible • Tiempo de trabajo perdido

4

Qué necesitamos saber?

1. Es posible pre-fabricar losas de hormigón? Sí 2. Y poner estas losas como pavimento? Sí

3. Duran los PCP? …mmh, sí?

PCP=Pavimentos de Concreto Prefabricados

5

Presentación de dos partes

2.Experimento de ensayo acelerado

1.Experiencias PCP

6

Parte 1: Experiencias PCP

7

Experiencias con PCP

• Casos históricos: (muy poco hecho antes de ~1999)

• South Dakota, Japón

• Casos Recientes – En Japón, Holanda, Francia – En USA: proyecto SHRP2-R05

8

Casos históricos

• South Dakota (~1960): – Hormigón pre-tensado, 11cm – Tramo de prieba de 300m en ruta US-14

• Japón – 1970: patios de contenedores y aeropuertos – En los 80’s: caminos

9

Japón • Losas reforzadas • Puestas sobre base de asfalto • Vacíos se llenan con mortero • Losas de 1.5m x 5.5m (media pista de ancho) • 20-25cm de espesor • Barras de traspaso de carga • Usadas en túneles de la

región norte: – Daño por ruedas con puntos de

acero – Renovar superficie, dar vuelta

las losas!!

(Nishizawa et al. 2006)

10

Japón

• PCP en uso por más de 20 años

• 90,000m2 al año 2006

• Diseños anteriores: – Sin asfalto, sin barras de carga Agrietamiento Transv. &

Escalonamiento • Nuevo diseño: sin problemas

(Nishizawa et al. 2006)

(Nishizawa et al. 2006)

Moderador
Notas de la presentación
More than 3000 slabs

11

Holanda

• ModieSlab – Modular, Intelligent, Energetic + Slab – Concurso “Caminos del Futuro” (2000 ) 1. 2001: Sección piloto, área de descanso 2. 2002: Ensayo acelerado, TU-Delft 3. 2006: Sección en carretera 4. 2010: Sección urbana

12

ModieSlab, Sección piloto – Paneles 12m x 3.5m o 5m x 3.5m – 30cm slab, con hormigón permeable en 5+2cm

– Entrada al área descanso,

carretera A50 – 29 losas, pilotes y vigas – 100m de largo

13

(CROW 2005)

(Houben et al. 2006)

14

(Smits 2004) (Houben et al. 2006) Resistencia al fuego

Mediciones de ruido Frenado

Pruebas de Fricción

(Smits 2004) (Smits 2004)

15

ModieSlab, APT • 4 losas, temperatura controlada • 75kN de carga, rueda “super-single • No hubo fallas por fatiga

(Houben et al. 2004) (Houben et al. 2006)

Con hormigón permeable

16

17

ModieSlab en carretera

– 100m, Ruta A12 motorway, construido en 2006 – Reducción del ruido de las ruedas

(Sandberg 2007)

18

19

Francia

• Pavimentos urbanos removibles

• Losas Hexagonales

• Investigado por el LCPC, 1. APT at “Fatigue-Carrousel” 2. Designs by the city of Nantes

20

LCPC “Carrousel de Fatiga ”

21

22

Diseño de la ciudad de Nantes

23

Norteamérica

1. Canada 2. PPCP by FHWA (Texas, California,

Missouri, and Iowa) 3. Michigan 4. Virginia 5. Colorado 6. KwikSlab 7. SuperSlab

24

25

26

27

Definición PCP

Sistemas de pavimento fabricados fuera, transportados al proyecto, e instalados en una fundación preparada (puede ser pavimento existente). Los componentes del sistema necesitan poco o nada de tiempo de curado o tiempo para ganar resistencia antes de abrir al tráfico.

28

Ventajas PCP

1.Hormigón de mejor calidad 2.Mejores condiciones de curado 3.Mínimas restricciones climáticas para instalar 4.Menor demora en apertura al tráfico 5.Eliminacion de fallas de edad temprana asociadas a la construccion

29

Atributos

• Constructibilidad • Durabilidad del hormigón • Transferencia de carga en las juntas • Soporte bajo el panel

No son “super pavimentos” y no se debe esperar que se comporten significativamente mejor

30

31

32

KwikSlab Cuatro losas en paradero de buses, Honolulu, 2006

33

34

Tipos de Pav. Prefabricados

• Sistemas con juntas • Sistemas pretensados

35

36

Método Michigan SuperSlab Intermitente SuperSlab Continuo

Texas California Missouri Iowa (Lane et al. 2005)

(Precastpavement.com )

37

PPCP

38

39

40

Super-Slab Desarrollado en New York por la compañia Fort Miller, en 2001

(Smith & Barenberg 2005)

(fortmiller.com)

41

Part 2: Experimento de ensayo acelerado

con Heavy Vehicle Simulator

43

Lugar del experimento • Carretera I-15 y SR210 en el

condado de San Bernardino

44

45

En la planta de prefabricado

Abril 2005

46

Preparación del lugar

47

Construcción 1. Capa de arena 2. Colocación de las losas 3. Aplicación de morteros a las losas

48

Detalles de las losas Barras con recubrimiento epóxico

Apertura para barras y esponja de

confinamiento del mortero

Lado hembra barras de amarre

Conexión barras de amarre

49

Instalación Lifting of the slab from the flat-bed Fixing the tie-bars on the longitudinal edge

Placement on adjacent lane

Dowel-bars bond-breaker

Moderador
Notas de la presentación
The pre-cast slabs arrived on site on flat-bed trucks and were lifted and lowered into place with a crane as is shown in Figure 5. The tie-bars were then screwed into the longitudinal edge of the slab connecting to the adjacent lane and the adjacent slab placed as is shown in Figure 6. The dowel-bars on the transverse joint were then sprayed with a bond-breaker as shown in Figure 7 and the placement of the slabs continued. Although great care was exercised in preparing the bedding layer, the edges of adjacent slabs did not align perfectly resulting in surface irregularities at the joints and corners as shown in Figure 8.

50

Mortero de asentamiento Filling dowel and tie-bar cavities with grout Removal of excess grout

Injection of bedding grout Excess bedding grout pouring from the exit hole

51

Mortero para las barras

52

Plan de Ensayos con HVS

• Thermal curl test • Ungrouted load test

• (1) Dry. Very high load • (2) Dry. High load • (2) Wet. High load • (1) Wet. Very high load

HVS test section 1

HVS test section 2

Preliminary tests

Regular tests

53

Instrumentación • Multi-depth Deflectometer stacks (MDDs) • Joint Deflection Measurement Devices (JDMD), H & V • Thermocouples

Slab 2 Slab 4

Slab 7 Slab 9

J1 J2 J3 J4 J5

J6 J7

J6(a) J7(a)

J8 J9 J10 J11 J12

H13 H14

H17 H18

H15 H16

H15(a) H16(a)

H15(b) H16(b)

T1T2

T3

T4

T5

T6

T7 T9T8

N

54

Transferencia de carga

-0.200

0.000

0.200

0.400

0.600

0.800

1.000

1.200

0 1 2 3 4 5 6 7 8

Distance (m)D

efle

ctio

n (m

m)

JDMD 1JDMD 2

Load

δa

δb

Load Transfer Efficiency (LTE)= δb/δa

δa = Peak deflection on approach slab

δb = Simultaneous deflection on leave slab

-0.200

0.000

0.200

0.400

0.600

0.800

1.000

1.200

0 1 2 3 4 5 6 7 8

Distance (m)D

efle

ctio

n (m

m)

JDMD 1JDMD 2

Load

δa

δb

Load Transfer Efficiency (LTE)= δb/δa

δa = Peak deflection on approach slab

δb = Simultaneous deflection on leave slab

55

Transferencia de carga

598FOUG ungrouted Load Transfer Effeciency (LTE)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0 5000 10000 15000 20000 25000 30000 35000

Repetitions

Load

Tran

sfer E

fficien

cy (%

)

JDMDs 1 & 2JDMDs 4 & 5

597FOUG ungrouted Load Transfer Effeciency (LTE)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0 5000 10000 15000 20000 25000 30000 35000

Repetitions

Load

Tran

sfer E

fficien

cy (%

)

JDMDs 1 & 2JDMDs 4 & 5

56

Con mortero

1. Aumento transf. de

carga – Ambos lados se

mueven juntos

2. Menor deflexión – 1mm 0.5mm – Menor esfuerzo en

losa y subbase

3. Se eliminó el movimiento

507FOUGResilient vertical deflection for a trafficked corner

-0.200

0.000

0.200

0.400

0.600

0.800

1.000

1.200

0 1 2 3 4 5 6 7 8

Distance (m)

Def

lect

ion

(mm

)

JDMD 1JDMD 2

Cycles: 32001, 32003, 32005

597FOTrafficked corner vertical deflection

-0.200

-0.100

0.000

0.100

0.200

0.300

0.400

0.500

0.600

0 1 2 3 4 5 6 7 8

Distance (m)

Def

lect

ion

(mm

)

JDMD 1JDMD 2

Cycles: 32013, 32015, 32017

Before

After

Se aplicó los dos morteros

57

58

Aplic.de carga en sección1 & 2 Section Duration

(months) Conditions /

tire type Load Reps.

(M)

ESALs (M)

1 3 (June - Sept, 2005) Dry / Aircraft 1.05 163

2 5 (Sept 2005- Feb, 2006) Dry / Truck 2.33 99

2 2 (Feb - May, 2006) Wet / Truck 1.13 43

1 5 (May - Aug, 2006) Wet / Aircraft 0.54 79

Section 2 • Dual truck tires

• 7 months

• 3.5M reps

• 142M ESALs

Section 1 • Aircraft wheel

• 8 months

• 1.6M reps

• 242M ESALs

59

Resultados Secciones 1 & 2

Section 2 • Dual truck tires

• 7 months

• 3.5M reps

• 142M ESALs

Section 1 • Aircraft wheel

• 8 months

• 1.6M reps

• 242M ESALs

96.3kN

118.5kN

Average load

Dry: no problems

Dry: corner cracks

Wet: failure

Wet: pumping, no cracks

Results

60

Deflexión y Transf. de carga

0.000

0.500

1.000

1.500

2.000

2.500

3.000

0 200000 400000 600000 800000 1000000 1200000 1400000

Repetitions

Def

lect

ion

(mm

)

0%

20%

40%

60%

80%

100%

120%

LTE

(%)

δaδbLTE

40 kN 80 kN 120 kN 150 kN

• Deflexiones aumentaron, transf. se mantuvo alta

61

Grietas de esquina (Sección 1, seco)

Cracks on either side of the transverse joint fully developed and extending from the transverse joint to the shoulder joint.

62

Agrietamiento Sección 2, con agua

63

Section 2 Pumping, no cracks

Water application (look at loaded tires!)

64

Pumped material

Pumping through the joint

65

Bombeo sección 2 vacío bajo la losa?

66

GPR did not work

67

No clear void

68

No problems with dowel grout

No big difference under the slab

loaded - unloaded

69

Post-mortem section 1

70

71

72

Parte 1: 1. Pavimentos de Concreto Prefabricados (PCP) están listos para

ser usados 2. Muchas agencias ya los están usando

Parte 2:

3. Los morteros mejoraron la respuesta del sistema. Bombeo no

causó daño 4. Con altas cargas y con agua, falló en la junta 5. Se puede esperar 140 millones de Ejes Equivalentes, o 25 a 37

años con el tráfico del lugar 6. Mismo tipo de falla que hormigón pavimentado in-situ

73

Conclusiones

Gracias