1
CALCULO DE MATERIALES CONCRETO f´c = 210 Kg/cm2: 1; 1 ½:3 VIGAS 4.5 M3 COLUMNAS 4.00 LOSA 2.5 ESCALERA 5.36 TOTAL 16.06 M3 CEMENTO 9,30 X 16.06 =149.4 BOLSAS ARENA GRUESA 0.402 X 16.06 = 6.46 PIEDRA0. 0.803 X 16.06 AGUA 0. CONCRETO f´c = 175Kg/cm2: 1; 1 ½:3 ZAPATAS TOTAL 16.06 M3

Construcciones

Embed Size (px)

Citation preview

Page 1: Construcciones

CALCULO DE MATERIALES

CONCRETO f´c = 210 Kg/cm2: 1; 1 ½:3

VIGAS 4.5 M3COLUMNAS 4.00LOSA 2.5ESCALERA 5.36TOTAL 16.06 M3

CEMENTO 9,30 X 16.06 =149.4 BOLSASARENA GRUESA 0.402 X 16.06 = 6.46PIEDRA0. 0.803 X 16.06 AGUA 0.

CONCRETO f´c = 175Kg/cm2: 1; 1 ½:3

ZAPATASTOTAL 16.06 M3