9
INCREMENTO DE PRECIOS EN CARRETERAS DESDE 1994 AL 2006 COSTO DE KILOMETRO DE CARRETERA ASFALTADA SECCION 11.20 MT OBRAS PROMEDIO OBRAS PROMEDIO COSTA 20 86,352 3 113,340 31.25 SIERRA 22 449,854 32 465,882 3.56 SELVA 5 466,053 18 421,244 -9.61 PROMEDIO 47 296,585 53 424,529 43.14 FUENTE MTC AREA GEOGRAFICA DE 1994 A 2003 DEL 2000 AL 2006 % INCREMENTO

Costocarreterasmtc

  • Upload
    dgpla

  • View
    189

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Costocarreterasmtc

INCREMENTO DE PRECIOS EN CARRETERASDESDE 1994 AL 2006

COSTO DE KILOMETRO DE CARRETERA ASFALTADASECCION 11.20 MT

OBRAS PROMEDIO OBRAS PROMEDIO

COSTA 20 86,352 3 113,340 31.25SIERRA 22 449,854 32 465,882 3.56SELVA 5 466,053 18 421,244 -9.61PROMEDIO 47 296,585 53 424,529 43.14FUENTE MTC

AREA GEOGRAFICA

DE 1994 A 2003 DEL 2000 AL 2006 % INCREMENTO

Page 2: Costocarreterasmtc

CARRETERAS EN EL PERU

COSTO POR KILOMETRO PROMEDIOPERIODO 1994 AL 2003

CALZADA ASFALTADA DE 11.20 MT DE SECCIONAREA

GEOGRAFICA 1994/2003

COSTA 86,352

SIERRA 449,854

SELVA 466,053

PROMEDIO 296,585

FUENTE MTC

Page 3: Costocarreterasmtc

COSTA OBRAS DESDE 1993 A 2003

FECHA

ITEM PROYECTO TIPO DE CONTRATISTA

NS USD NS USD NS USD % NS USD OBRA INICIO TERMINO

1Carretera Panamericana Sur, Tramo Palpa -Desvio Lomas

140.00 2.2 12,097,089 5,498,677 23,706,805 10,775,820 11,609,716 5,277,143 95.97 169,334.32 76,970 RConsorcio PEDECA C.A. -. SerrviconS.A.

15/09/1992 12/05/1994

2Carretera Panamericana Norte, TramoHuarmey. - Puente Santa.

150.35 2.2 8,353,234 3,796,925 18,062,550 8,210,250 9,709,316 4,413,325 116.23 120,136.68 54,608 R

Consorcio J.Alva Centurión Constr.S.A.JACCSA CIAPavimentacaoTerraplenegen (JACCSA - CIPATE)

17/09/1992 31/12/1994

3Carretera Panamericana Norte, Tramo Huacho - Huarmey.

148.00 2.2 11,333,804 5,151,729 23,104,066 10,501,848 11,770,262 5,350,119 103.85 156,108.55 70,958 RARAMSA Contratistas GeneralesBRUCE S.A. Contratistas GeneralesS.A.- José Heighes S.A Asociados.

22/09/1992 15/02/1994

4Carretera Panamericana Sur, TramoAccw esoMicroondas Canal 4 (Km.347+000 - Palpa

43.00 2.2 3,208,273 1,458,306 4,047,129 1,839,604 838,856 381,298 26.15 94,119.27 42,781 MP Bitumtn S.A. 25/06/1993 23/02/1994

5Carretera Panamericana Sur, Tramo PuertoViejo Km. 715.

68.00 2.2 2,484,127 1,129,149 2,482,620 1,128,464 -1,507 -685 -0.06 36,509.12 16,595 MPGUICONSA W.M. ContratistasGenerales S.A. - Suministro deEquipos S.A. Asociados.

25/06/1993 01/03/1994

6Carretera Panamericana Sur, Tramo El Fiscal - Puente Montalvo.

100.00 2.2 7,767,295 3,530,589 9,259,868 4,209,031 1,492,573 678,442 19.22 92,598.68 42,090 MPIngenieros Civiles & ContratistasGenerales S.A. ICCGSA.

25/06/1993 21/04/1994

7Caretera Panamericana Sur , Tramo DesvioLomas - Puente Viejo

117.00 2.2 21,246,809 9,657,640 33,273,343 15,124,247 12,026,534 5,466,606 56.60 284,387.55 129,267 RConstructora Norberto OdebrechtS.A.

25/08/1993 31/07/1994

8Carretera Panamericana Sur, Tramo Km. 715Puente Haw ay

95.00 2.2 11,777,461 5,353,391 17,042,431 7,746,560 5,264,970 2,393,168 44.70 179,394.01 81,543 R C. Tizón P.S:A. 27/08/1993 26/08/1994

9Carretera Panamericana Sur, Tramo Puentehaw ay - Acceso Microonda Canal 4(Km.897+600

88.00 2.2 9,530,865 4,332,211 13,114,366 5,961,075 3,583,501 1,628,864 37.60 149,026.89 67,739 RImpresit del Pacxif ico SAEMA. MassaIngs S.C.R.L. Contratistas GeneralesAsociados.

27/08/1993 07/08/1994

10Carretera Panamericana Sur, Tramo -Acceso Microonda Canal 4 (Km.897+600 -Desvio Mollendo.

84.50 2.2 10,989,745 4,995,339 15,440,549 7,018,431 4,450,804 2,023,093 40.50 182,728.39 83,058 R VEGSA Contratistas Generales 07/09/1993 18/08/1994

11Carretera Panamericana Sur, Tramo DesvioQuilmana - Chincha - Puente Huamani.

107.50 2.2 18,278,874 8,308,579 21,185,489 9,629,768 2,906,615 1,321,189 15.90 197,074.32 89,579 RConstructora Andrade Gutierrez S.A.GESSA Ings. Asociados.

16/09/1993 17/11/1994

12Carretera Panamericana Sur, TraMO PuenteHuamani - Acceso Microonda Canal 4(Km.229+600 - Km. 347+000)

117.50 2.2 20,626,209 9,375,550 21,551,122 9,795,965 924,913 420,415 4.48 183,413.80 83,370 RConstructora Andrade Gutierrez S.A.GESSA Ings. Asociados.

16/09/1993 17/11/1994

13carretera Panamericana Sur, Tramo desvíoMollendo - El Fiscal,

58.00 2.5 17,779,653 7,111,861 17,937,736 7,175,094 158,083 63,233 0.89 309,271.31 123,709 RConstructora UPACA S.A. Inmob.Constructora Luren S.A. Asociados.

12/01/1994 21/02/1995

14Carretera Panamericana Sur, Tramo PuenteMontalvo - Puente Camiara.

72.83 2.5 20,022,853 8,009,141 24,027,572 9,611,029 4,004,719 1,601,888 20.00 329,913.11 131,965 RAsociación COSAP S.A. - MendezJuniorEngenhana S.A.

04/03/1994 17/01/1995

15Carretera Panamew ricana Sur, Tramo PuenteCamiara - Tacna.

78.31 2.5 19,531,845 7,812,738 23,357,143 9,342,857 3,825,298 1,530,119 19.58 298,265.14 119,306 RConstructora PEDECA C.A. ServiconS.A.Servicios y ConstruccionesAsociados.

04/03/1994 14/01/1995

16Carretew ra Panamereicana Norte, TramoPacasmayo - Chepen

46.29 2.5 9,514,176 3,805,670 10,865,924 4,346,370 1,351,748 540,699 14.21 234,735.88 93,894 MRSuperconcreto del Perú S.A.Supercemento S.A.I.C. Asociados.

15/08/1994 12/06/1995

17Carretera Panamericana Norte, Tramo Chepen - Chiclayo - Emp. Ruta 1N (Lambayeque

71.10 2.5 21,064,052 8,425,621 22,962,661 9,185,064 1,898,609 759,444 9.01 322,962.88 129,185 MRImpresit del Pacxifico S.A. MassaContratistas Generales S.R.L.Asociados.

15/08/1994 04/10/1995

18Carretera Panamericana Norte, Puente Santa -Ovalo Industrial (Km. 558+870)

113.43 2.5 26,325,683 10,530,273 29,911,682 11,964,673 3,585,999 1,434,399 13.62 263,701.68 105,481 MR Emp.Constructora Fe Grande S.A. 19/08/1994 29/11/1995

19Carretera Panamericana Norte, Tramo Km.558+300 - Empalme Ruta 1N (El Milagro Km.573+868)

28.77 2.5 4,791,477 1,916,591 5,358,565 2,143,426 567,088 226,835 11.84 186,255.30 74,502 MRICE Ingenieros S.A. J.J.C. IngenierosS,A. Asociados.

19/08/1994 03/02/1995

20Carretera Panamericana Norte, Tramo Parque Industrial (Km. 573+870) - Pacasmayo.

94.19 2.5 21,555,889 8,622,356 26,007,029 10,402,812 4,451,140 1,780,456 20.65 276,112.42 110,445 MRICE Ingenieros S.A. J.J.C. IngenierosS,A. Asociados.

19/08/1994 17/08/1995

FUENTE MTC, TIPO DE CAMBIO SUNAT PROMEDIO 86,352

CONTRATO

LONGITUD EN KM

TIPO DE CAMBIO

CONTRACTUAL LIQUIDACIÓN FINAL ADICIONAL COSTO KILOMETRO

Page 4: Costocarreterasmtc

SIERRAOBRAS DESDE 1993 A 2003

FECHA

ITEM PROYECTO TIPO DE CONTRATISTA

NS USD NS USD NS USD % NS USD OBRA INICIO TERMINO

1Caretera Pisco - Ayacucho, Tramo I: Dv.San Clemente -Pte Pacra.

80.17 3.1 47,636,412 15,366,585 82,232,488 26,526,609 34,596,076 11,160,025 72.63 1,025,726.43 330,879 RM Constructora Norberto Odebrecht S.A. 14/09/1996 31/07/1998

2Caretera Pisco - Ayacucho, Tramo II: Pte Pacra.- pte.Choclococha.

88.67 3.1 43,910,002 14,164,517 59,097,440 19,063,690 15,187,438 4,899,174 34.59 666,487.43 214,996 RMConstructora OAS Ltda Constructora UPACAS.A. Asocados

18/09/1996 04/11/1998

3Caretera Pisco - Ayacucho, Tramo III: Pte Choclococha- Pte Niñacha.

81.20 3.1 50,303,263 16,226,859 72,062,492 23,245,965 21,759,229 7,019,106 43.26 887,469.11 286,280 RM Asociación COSAPI - Mendez Junior 18/09/1996 02/09/1998

4Caretera Pisco - Ayacucho, Tramo IV: Pte Niñacha -Ayacucho.

86.94 3.1 52,879,408 17,057,874 73,756,006 23,792,260 20,876,598 6,734,386 39.48 848,355.26 273,663 RMEngilSociedade de Construcao Civil S.A. -Construcciones Villasol S:A:ContratistasGenerales Asoc.

18/09/1996 15/11/1998

5Carretera Ilo - Desaguadereo Tramo V:(km.205+00 -Km. 235+000).

30.00 3.1 38,806,706 12,518,292 42,649,275 13,757,831 3,842,569 1,239,538 9.90 1,421,642.50 458,594 RM Energoprojekt Bartos Asociados.. 06/03/1997 30/09/1998

6Carretera Ilo - Desaguadero Tramo I: (km. 0 +000 -Km.52+147

52.15 3.1 32,979,729 10,638,622 34,364,004 11,085,163 1,384,275 446,540 4.20 658,945.43 212,563 RM G y M S.A. 07/03/1997 12/01/1998

7Carretera Ilo - Desaguadereo Tramo III: (km.135+000 -Km. 180+000).

45.00 3.1 59,499,518 19,193,393 67,192,091 21,674,868 7,692,573 2,481,475 12.93 1,493,157.58 481,664 RM Construcoes e Camargo Correa S.A. 07/03/1997 27/07/1998

8Carretera Ilo - Desaguadereo Tramo IV: (km.180+219 -Km. 205+000).

25.00 3.1 30,966,522 9,989,201 40,588,003 13,092,904 9,621,481 3,103,704 31.07 1,623,520.12 523,716 RMIngenieros Civiles &Contratistas GeneralesS.A (ICCGSA)

07/03/1997 03/10/1998

9Carretera Ilo - Desaguadereo Tramo II: (km.90+219 -Km. 135+000).

44.78 3.23 43,285,225 13,400,998 49,981,139 15,474,037 6,695,914 2,073,038 15.47 1,116,148.70 345,557 RMConstrucciones Villasol S.A. ContratistsGenerales S.A.

21/03/1997 03/08/1999

10Carretera Nazca - Abancay - Cuzco Tramo 5, TramoPuquio - Desvio Pampachiri.

88.32 3.23 105,384,136 32,626,667 133,232,869 41,248,566 27,848,733 8,621,899 26.43 1,508,524.33 467,035 RM C. Tizón P.S:A. 02/06/1997 19/12/1999

11Carretera Nazca Abancay - Cuzco: Tramo 2: DesvioPampachiri Chalhuanca.

96.29 3.23 149,047,582 46,144,762 189,995,723 58,822,205 40,948,141 12,677,443 27.47 1,973,161.52 610,886 RM JJC Contratistas Generales S.A. 02/06/1997 28/09/1999

12Carretera Ilo - Desaguadereo Tramo VI: (km235+00 -Km. 275+000).

40.00 3.5 44,009,011 12,574,003 67,752,966 19,357,990 23,743,955 6,783,987 53.95 1,693,824.15 483,950 RM Constructora Norberto Odebrecht S.A. 09/01/1999 15/01/2000

13Carretera Ilo - Desaguadereo Tramo VII: (km.275+000 -Km. 315+000).

40.00 3.5 50,054,355 14,301,244 63,061,862 18,017,675 13,007,507 3,716,431 25.99 1,576,546.55 450,442 RM Constructora Norberto Odebrecht S.A. 09/01/1999 15/01/2000

14Carretera Ilo - Desaguadereo Tramo VIII: (km.315+000 -Km. 356+000).

41.00 3.5 51,640,080 14,754,309 67,867,580 19,390,737 16,227,500 4,636,429 31.42 1,655,306.83 472,945 RM Constructora Norberto Odebrecht S.A. 09/01/1999 15/01/2000

15Carretera Ilo - Desaguadereo Tramo IX: (km.356+000 -Km. 397+201).

41.20 3.5 50,883,480 14,538,137 64,787,562 18,510,732 13,904,082 3,972,595 27.33 1,572,513.64 449,290 RMAsociación Besalco S.A. CorporaciónSagitario S.A.

09/01/1999 15/01/2000

16Caretera Yura - Patahuasi - Santa Lucia, Tramo I: Yura - Pastahuasi (Long. Total 53.34 Km.)

18.67 3.49 22,379,046 6,412,334 27,442,406 7,863,154 5,063,360 1,450,819 22.63 1,469,866.42 421,165 RMAsoc.GuTSA Construcciones S.A de C.V.ARAMSA Contratistas Generales

01/07/1999 15/04/2002

17Caretera Yura - Patahuasi - Santa Lucia, Tramo II:Pastahuasi Est. Vincocaya

42.00 3.49 64,052,761 18,353,227 84,752,820 24,284,476 20,700,059 5,931,249 32.32 2,017,924.29 578,202 RM Constructora Queiroz Galvao S.A. 01/07/1999 03/11/2001

18Carretera Yura - Patahuasi - Santa Lucia, Tramo IV:Est. Crucero Alto - Santa Lucia

49.11 3.49 80,661,406 23,112,151 116,317,640 33,328,837 35,656,234 10,216,686 44.20 2,368,512.32 678,657 RM COSAPI S.A. Ingeniería y Construcción 13/09/1999 23/11/2002

19Caretera Yura - Patahuasi - Santa Lucia, Tramo III: Est.Vincocaya - Est. Crucero Alto

35.00 3.49 44,647,921 12,793,101 59,304,677 16,992,744 14,656,756 4,199,644 32.83 1,694,419.34 485,507 RM Constructora Queiroz Galvao S.A. 04/10/1999 27/11/2001

20Carretera Chalhunca - Abancay Tramo I: Chalhuanca -Punte Antarumi.

63.00 3.49 177,516,377 50,864,291 177,581,853 50,883,052 65,476 18,761 0.04 2,818,759.57 807,667 R J.J.C. Contratistas Generales 13/09/2001 05/06/2003

21Carretera Chalhunca - Abancay Tramo II: PunteAntarumi. - Abancay.

55.57 3.49 114,817,467 32,898,988 124,347,295 35,629,597 9,529,828 2,730,610 8.30 2,237,669.52 641,166 R Energoprojekt Holding S.A. 11/01/2002 31/10/2003

22Caretera Yura - Patahuasi - Santa Lucia, Tramo I: Yura - Pastahuasi (Saldo de Obra.)

34.67 3.49 19,998,343 5,730,184 26,856,202 7,695,187 6,857,859 1,965,003 34.29 774,623.65 221,955 RMConsorcio YURA (Constructora PEDECA C:A.-SVC INGENIERIA Y Construcción S.A.

22/01/2003 07/12/2003

FUENTE MTC, TIPO DE CAMBIO SUNAT PROMEDIO 449,854

CONTRATO

LONGITUD EN KM

TIPO DE CAMBIO

CONTRACTUAL LIQUIDACIÓN FINAL ADICIONAL COSTO KILOMETRO

Page 5: Costocarreterasmtc

SELVAOBRAS DESDE 1993 A 2003

FECHA

ITEM PROYECTO TIPO DE CONTRATISTA

NS USD NS USD NS USD % NS USD OBRA INICIO TERMINO

1Carretera Rioja - Tarapoto, Tramo I: Km. 0+000 - Km50+000

50.00 3.47 83,843,122 24,162,283 111,809,636 32,221,797 27,966,514 8,059,514 33.36 2,236,192.72 644,436 RM Impregilo S.pA. 15/05/2000 10/07/2003

2Carretera Rioja - Tarapoto, Tramo III: Km. 91+000 - Km135+000

44.04 3.5 56,857,034 16,244,867 85,953,567 24,558,162 29,096,533 8,313,295 51.17 1,951,715.87 557,633 RM Constructora Queiroz Galvao S.A. 25/07/2000 25/06/2002

3Carretera Rioja - Tarapoto, Tramo II: Km. 50+000 - Km91+000

41.00 3.47 61,613,617 17,756,086 88,298,401 25,446,225 26,684,784 7,690,139 43.31 2,153,619.54 620,640 RM Constructora Queiroz Galvao S.A. 28/05/2001 06/02/2003

4Carretera Olmos - Corral Quemado Tramo I: Km. 0+000- Km. 79+000

79.00 3.5 57,544,248 16,441,214 59,719,558 17,062,731 2,175,310 621,517 3.78 755,943.77 215,984 RIngenieros Civiles &Contratistas Generales -C.Tizón P.S.A. Asociados

10/08/2001 17/07/2002

5Carretera Olmos - Corral Quemado Tramo II: Km.79+000 - Km. 140+000

61.00 3.23 51,076,642 15,813,202 57,448,783 17,786,001 6,372,141 1,972,799 12.48 941,783.33 291,574 R Consorcio ICCGSA - UPACA Asociados. 21/11/2003 31/10/2004

FUENTE MTC, TIPO DE CAMBIO SUNAT PROMEDIO 466,053

CONTRATO

LONGITUD EN KM

TIPO DE CAMBIO

CONTRACTUAL LIQUIDACIÓN FINAL ADICIONAL COSTO KILOMETRO

Page 6: Costocarreterasmtc

CARRETERAS EN EL PERU

COSTO POR KILOMETRO PROMEDIOPERIODO 2000 AL 2006

CALZADA ASFALTADA DE 11.20 MT DE SECCION

AREA GEOGRAFICA 2000/2006

COSTA 113,340SIERRA 465,882SELVA 421,244PROMEDIO 424,529

FUENTE M TC

Page 7: Costocarreterasmtc

COSTAOBRAS DESDE 2000 A 2006

PLAZO

( )días /.S US$ /.S US$ /.S /TC US$

1 Carretera Panamericana Norte, Grupo V, Tr.: Dv.Olmos - Km 172

Bitumen S.A. - Cilloniz, Olazábal, UrquiagaS.A. Asociados

80.60 603 16,363,641.37 196,999.71 16,560,637.58 17-08-94 11-04-96 24,339,729.76 232,459.66 25,153,338.57 312,076.16 3.5 89,164.62

2 Carretera Panamericana Norte, Grupo V, Tr. 3: Km172, Caserío Noria Zapata -Piura

Ce.Ce.Ge. S.A. - Bionselva S.A. -Contratistas Generales Asociados

83.30 647 1,594,998.92 193,270.03 2,271,444.03 27,021,936.98 228,058.60 27,820,142.08 333,975.30 3.5 95,421.51

3 Ptos. Críticos de Carretera Panamericana Sur, Est.2: Pampa Clemesí - Pte. Tomasiri (Km 1109 - Km1257)

T y T S.A.C. Contratistas Generales 15.90 194 9,157,812.10 0.00 9,157,812.10 07-06-04 17-12-04 8,649,927.43 0.00 8,649,927.43 544,020.59 3.5 155,434.46

179.80 27,116,452.39 390,269.74 27,989,893.71 60,011,594.17 460,518.26 61,623,408.08 396,690.68 113,340.20FUENTE MTC, TIPO DE CAMBIO SUNAT CARRETERA CON INDICIOS DE SOBREVALORACION

.COSTOXKM

COMPONENTES TOTALENNS COMPONENTES COSTOTOTAL ENNS

TOTALES

ITEM PROYECTO CONTRATISTA

LONGKM

MONTOCONTRACTUAL

INICIO TÉRMINO

COSTO FINAL

Page 8: Costocarreterasmtc

SIERRAOBRAS DESDE 2000 A 2006

PLAZO

( )días /.S US$ /.S US$ /.S /TC US$

1 Carretera Ilo - Desaguadero, Tramo 6 Constructora Norberto Odebrecht S.A. 40.00 372 44,009,011.21 0.00 44,009,011.21 09-01-99 15-01-00 67,752,966.45 0.00 67,752,966.45 1,693,824.16 3.489 485,475.542 Carretera Ilo - Desaguadero, Tramo 7 Constructora Norberto Odebrecht S.A. 40.00 372 50,054,355.24 0.00 50,054,355.24 09-01-99 15-01-00 63,498,710.89 0.00 63,498,710.89 1,587,467.77 3.489 454,992.203 Carretera Ilo - Desaguadero, Tramo 8 Constructora Norberto Odebrecht S.A. 41.00 372 51,640,079.87 0.00 51,640,079.87 09-01-99 15-01-00 67,884,379.16 0.00 67,884,379.16 1,655,716.56 3.489 474,553.334 Carretera Ilo - Desaguadero, Tramo 9 Asociación Besalco S.A. - Corporación

Sagitario S.A. Asociados41.20 372 50,883,479.90 0.00 50,883,479.90 09-01-99 15-01-00 64,787,561.82 0.00 64,787,561.82 1,572,475.47 3.489 450,695.18

5 Carretera Yura - Patahuasi - Santa Lucía, Tr. 1:Yura - Patahuasi

Asociación Gutsa Construcciones S.A. deC.V. - ARAMSA Contratistas Generales

18.67 1020 22,379,046.28 0.00 22,379,046.28 01-07-99 15-04-02 27,442,406.32 0.00 27,442,406.32 1,470,023.91 3.5 420,006.83

6 Carretera Yura - Patahuasi - Santa Lucía, Tr. 1:Yura - Patahuasi (Saldo de Obra)

Constructora PEDECA C.A. - SVC/Ingeniería y Construcción S.A.

34.67 320 19,998,343.24 0.00 19,998,343.24 22-01-03 07-12-03 26,856,201.94 0.00 26,856,201.94 774,668.34 3.5 221,333.81

7 Carretera Yura - Patahuasi - Santa Lucía, Tr. 2:Patahuasi - Est. Vincocaya

Construtora Queiroz Galvao S.A. 42.00 857 64,052,760.65 0.00 64,052,760.65 01-07-99 03-11-01 51,898,136.63 11,848,064.59 93,366,362.70 2,223,008.64 3.5 635,145.32

8 Carretera Yura - Patahuasi - Santa Lucía, Tr. 3:Est. Vincocaya - Est. Crucero Alto

Construtora Queiroz Galvao S.A. 35.00 786 44,647,921.43 0.00 44,647,921.43 04-10-99 27-11-01 0.00 21,386,468.28 74,852,638.98 2,138,646.83 3.5 611,041.95

9 Carretera Yura - Patahuasi - Santa Lucía, Tr. 4:Est. Crucero Alto - Santa Lucía

Cosapi S.A. Ingeniería y Construcción 49.11 1168 80,661,405.76 0.00 80,661,405.76 13-09-99 23-11-02 0.00 41,946,498.39 146,812,744.37 2,989,406.54 3.5 854,116.15

10 Carretera Cusco - Abancay, Tramo 4 Bufete Industrial Construcciones S.A. de C.V. - Constructora Upaca S.A. Asociados

49.92 901 0.00 22,313,943.48 78,098,802.18 06-07-99 22-12-01 0.00 24,852,873.68 86,985,057.88 1,742,419.33 3.5 497,834.09

11 Variante de la Carretera Ilo - Desaguadero Corporación Sagitario S.A. 2.04 106 11,632,645.09 0.00 11,632,645.09 11-10-01 24-01-02 11,632,645.09 0.00 11,632,645.09 5,705,073.61 3.5 1,630,021.03

12 Carretera Chalhuanca - Abancay, Tr. 1:Chalhuanca - Pte. Antarumi

J.J.C. Contratistas Generales S.A. 63.00 631 177,516,376.71 0.00 177,516,376.71 13-09-01 05-06-03 0.00 50,883,052.49 178,090,683.72 2,826,836.25 3.5 807,667.50

13 Carretera Chalhuanca - Abancay, Tr. 2: Pte.Antarumi - Abancay

Energoprojekt Holding S.A. 55.57 659 114,817,467.07 0.00 114,817,467.07 11-01-02 31-10-03 0.00 35,629,597.39 124,703,590.87 2,244,121.56 3.5 641,177.59

14 Carretera Héroes de la Breña, Tramo 1: Pte.Ricardo Palma - Cocachacra

Consorcio T y T SAC ContratistasGenerales - W. Jackson & SonsConstruction Co. Sucursal del Perú

14.45 318 11,488,574.13 0.00 11,488,574.13 15-10-01 28-08-02 11,016,530.30 0.00 11,016,530.30 762,495.18 3.5 217,855.76

15 Carretera Héroes de la Breña, Tramo 2:Cocachacra - Matucana

Consorcio PAVEX Coorporation Perú -JOHESA

21.35 324 18,323,199.94 0.00 18,323,199.94 15-10-01 03-09-02 18,784,963.63 0.00 18,784,963.63 879,981.43 3.5 251,423.27

16 Carretera Héroes de La Breña, Tr. 3: Matucana -San Mateo

Consorcio Superconcreto del Perú - ACS 21.28 574 19,326,703.50 0.00 19,326,703.50 19-12-01 15-07-03 17,300,513.06 0.00 17,300,513.06 812,841.25 3.5 232,240.36

17 Carretera Héroes de La Breña, Tr. 4: San Mateo -La Oroya

Corporación Sagitario S.A. 79.33 725 80,241,278.48 0.00 80,241,278.48 06-08-03 30-07-05 86,391,087.55 0.00 86,391,087.55 1,089,009.05 3.5 311,145.44

18 Carretera La Oroya - Huancayo, Tr. 1: La Oroya -Puente Matachico

VEGSA C.G. - Mendez Junior Group 39.58 303 56,979,695.39 0.00 56,979,695.39 19-12-01 17-10-02 52,747,522.38 0.00 52,747,522.38 1,332,681.21 3.5 380,766.06

19 Carretera La Oroya - Huancayo, Tr. 1: La Oroya -Pte. Matachico (Saldo de Obra)

Corporación Sagitario S.A. 20.00 345 10,719,247.82 0.00 10,719,247.82 19-07-04 28-06-05 12,623,770.93 0.00 12,623,770.93 631,188.55 3.5 180,339.58

20 Carretera La Oroya - Huancayo, Tr. 2: Pte.Matachico - Huancayo

Construcoes e Comercio Camargo CorreaS.A.

56.78 380 80,783,399.42 0.00 80,783,399.42 15-09-03 28-09-04 0.00 21,616,669.67 75,658,343.85 1,332,482.28 3.5 380,709.22

21 Carretera Jauja - Tarma Consorcio ICCGSA - IESA 56.01 365 0.00 0.00 28-02-05 27-02-06 94,125,640.05 0.00 94,125,640.05 1,680,514.91 3.5 480,147.1222 Carretera Huancayo - Imperial Consorcio OHL - CyM Asociados 33.00 501 0.00 44,893,195.21 157,126,183.24 03-07-00 15-11-01 39,033,760.52 61,249.91 39,248,135.21 1,189,337.43 3.5 339,810.69

23 Carretera Cusco - Combapata Construtora Andrade Gutierrez S.A. 96.00 540 0.00 47,489,969.00 166,214,891.50 08-03-00 29-08-01 0.00 42,002,321.37 147,008,124.80 1,531,334.63 3.5 437,524.18

24 Carretera Pisco - Ayacucho, Tr. 2: Pte. Pacra -Pte. Choclococha

Consorcio Constructora OAS Ltda. -Constructora Upaca S.A.

88.67 778 43,910,002.21 0.00 43,910,002.21 18-09-96 04-11-98 59,046,647.69 0.00 59,046,647.69 665,914.60 3.5 190,261.31

25 Carretera Central, Grupo V, Tr.: Huayre - Chicrín Aramsa Contratistas Generales S.A.C. -Construcción y Administración S.A.,Asociados

76.63 360 22,312,260.31 195,630.06 22,996,965.52 06-06-96 31-05-97 31,428,997.41 197,270.51 32,119,444.20 419,177.09 3.5 119,764.88

26 Carretera Central, Tr.: La Oroya - Huayre Asociación Andrade Gutiérrez - JohesaAsociados

72.52 644 38,996,032.65 6,050,525.04 60,172,870.29 20-08-97 25-05-99 42,543,312.91 6,627,240.48 65,738,654.59 906,490.00 3.5 258,997.14

27 Carretera Imperial - Izcuchaca Consorcio GyM - C. Tizón p.s.a.c. 33.44 514 96,506,012.60 0.00 96,506,012.60 21-06-03 15-11-04 98,020,665.19 0.00 98,020,665.19 2,931,239.99 3.5 837,497.1428 Carretera Ingenio Chachapoyas, Sector: Dv.

Leymebamba - ChachapoyasConstructora Upaca S.A. 13.60 546 26,786,046.06 0.00 26,786,046.06 17-01-03 15-07-04 29,846,382.33 0.00 29,846,382.33 2,194,586.94 3.5 627,024.84

29 Carretera Huancayo - Imperial, Tr. PuenteChanchas – Huayucachi

Consorcio Cobert Contratistas GeneralesS.A.C. - Avendaño Vidal ContratistasGenerales S.A.C.

4.37 361 6,902,787.82 0.00 6,902,787.82 06-09-03 31-08-04 6,570,700.26 0.00 6,570,700.26 1,502,904.91 3.5 429,401.40

30 Carretera Lima - Canta - Unish, Tr.: Canta - Unish,Sector: Huayllay - Cochamarca

Consorcio Unish (CASA - ARAMSA) 18.35 535 25,180,036.57 0.00 25,180,036.57 26-08-03 10-02-05 26,875,706.47 0.00 26,875,706.47 1,464,616.16 3.5 418,461.76

31 Carretera Ayacucho - San Francisco, Tr. 1: Dv.Huanta - Tambo, Sector: Dv. Huanta - Quinua

Corporación Sagitario S.A. 26.00 432 29,430,727.20 0.00 29,430,727.20 17-03-05 22-05-06 36,446,434.82 0.00 36,446,434.82 1,401,785.95 3.5 400,510.27

32 Carretera Huallanca - Huanzalá - Dv. Antamina Consorcio JACCSA - MONTES 15.43 496 11,916,908.71 0.00 11,916,908.71 23-06-04 31-10-05 12,437,359.74 0.00 12,437,359.74 806,050.53 3.5 230,300.151,298.96 1,312,095,805.26 120,943,262.79 1,735,397,225.03 1,056,993,003.54 257,051,306.76 1,956,672,577.20 1,629,947.53 465,882.53

FUENTE MTC, TIPO DE CAMBIO SUNAT CARRETERA CON INDICIOS DE SOBREVALORACION

.COSTO XKM

COMPONENTES TOTALENNS COMPONENTES COSTO TOTAL ENNS

TOTALES

ITEM PROYECTO CONTRATISTA

LONGKM

MONTO CONTRACTUAL

INICIO TÉRMINO

COSTO FINAL

Page 9: Costocarreterasmtc

SELVAOBRAS DESDE 2000 A 2006

PLAZO

( )días /.S US$ /.S US$ /.S /TC US$

1 Carretera Olmos - Corral Quemado, Tr. 3: Km140+000 - Km 196+253.04

Consorcio Río Marañón (JJC - Johesa -Pavex)

56.25 555 73,095,073.15 0.00 73,095,073.15 04-12-03 10-06-05 19,910,958.35 17,943,691.20 82,713,877.55 1,470,468.93 3.5 420,133.98

2 Carretera Chamaya - Jaén - Sn. Ignacio, Tr.:Chamaya - Jaén - Km 50

Consorcio Jaén (Energoprojekt - W.Jackson & Sons - Johesa)

50.08 610 55,822,209.40 0.00 55,822,209.40 17-02-04 18-10-05 14,489,083.13 14,172,354.88 64,092,325.21 1,279,798.83 3.5 365,656.81

3 Carretera Tingo María - Aguaytía, Tr. 2: Pte. Chino -Aguaytía

Constructora Norberto Odebrecht S.A.Sucursal Trujillo

42.34 766 108,476,007.67 0.00 108,476,007.67 29-04-03 02-06-05 36,648,758.41 32,267,243.53 149,584,110.77 3,532,926.57 3.5 1,009,407.59

4 Carretera Tarma - La Merced Constructora Andrade Gutierrez S.A. 71.60 1188 30,126,328.52 4,592,630.95 43,950,147.68 01-06-95 31-08-98 66,059,998.50 8,876,184.21 92,777,312.97 1,295,772.53 3.01 430,489.215 Carretera La Merced - Satipo, Tr. 1: La Merced -

ShankivironiConstructora Andrade Gutierrez S.A. 62.93 758 41,267,135.36 0.00 41,267,135.36 08-09-96 05-10-98 66,893,541.36 9,785,419.43 96,895,637.33 1,539,736.81 3.066 502,197.26

6 Carretera La Merced - Satipo, Tr. 2: Shankivironi -Satipo

Victorio Américo Gualtieri - BartosAsociados

59.70 695 0.00 0.00 05-09-96 01-08-98 44,216,966.71 0.00 44,216,966.71 740,652.71 3.01 246,064.02

7 Carretera Pte. Corral Quemado - Pte. Río Nieva,Tr.: Corral Quemado - Pedro Ruiz

Construcoes e Comercio Camargo Correa 96.55 1041 55,275,171.76 0.00 55,275,171.76 13-09-96 20-07-99 47,151,166.18 10,913,400.39 83,525,529.68 865,101.29 3.333 259,556.34

8 Carretera Pte. Corral Quemado - Pte. Río Nieva,Tr.: Pedro Ruiz - Río Nieva

Construcoes e Comercio Camargo Correa 78.00 1089 88,065,885.19 0.00 88,065,885.19 15-09-96 08-09-99 54,880,526.42 15,064,446.87 107,033,641.48 1,372,226.17 3.462 396,368.05

9 Carretera Río Nieva - Rioja, Tr. 2B: Pte. El Afluente- Pte. Naranjos

JJC Contratistas Generales S.A. 25.00 383 20,741,875.07 0.00 20,741,875.07 01-04-97 18-04-98 26,144,080.00 0.00 26,144,080.00 1,045,763.20 3.826 273,330.68

10 Carretera Huánuco - Tingo María, Tr. 2: Caracol -Tingo María

Asociación G y M S.A. - COSAPI S.A. 62.20 459 20,504,329.84 0.00 20,504,329.84 19-06-96 20-09-97 29,985,022.20 0.00 29,985,022.20 482,074.31 2.652 181,777.64

11 Carretera Rioja - Tarapoto, Tr. 1: Km 0+000 - Km50+000

IMPREGILO SPA 50.00 1152 70,273,946.27 0.00 70,273,946.27 15-05-00 10-07-03 44,051,029.57 21,462,973.32 119,171,436.19 2,383,428.72 3.5 680,979.64

12 Carretera Rioja - Tarapoto, Tr. 2: Km 50+000 - Km91+000

Queiroz Galvao S.A. 41.00 620 68,112,614.77 0.00 68,112,614.77 28-05-01 06-02-03 0.00 27,969,084.95 97,891,797.33 2,387,604.81 3.5 682,172.80

13 Carretera Rioja - Tarapoto, Tr. 3: Km 91+000 - Km135+000

Queiroz Galvao S.A. 44.00 700 62,764,257.79 0.00 62,764,257.79 25-07-00 25-06-02 0.00 27,226,343.75 95,292,203.13 2,165,731.89 3.5 618,780.54

14 Carretera Olmos - Corral Quemado, Tr. 1: Km0+000 - Km 79+000

Tizón - ICCGSA Asociados 79.00 342 58,486,783.39 0.00 58,486,783.39 10-08-01 17-07-02 0.00 17,160,792.42 60,062,773.47 760,288.27 3.5 217,225.22

15 Carretera Olmos - Corral Quemado, Tr. 2: Km79+000 - Km 140+000

ICCGSA - UPACA Asociados 61.00 346 51,076,642.29 0.00 51,076,642.29 21-11-03 31-10-04 57,448,783.31 0.00 57,448,783.31 941,783.33 3.5 269,080.95

16 Carretera Tarapoto - Juanjuí, Sector: Km 1+000 -Km 11+000

JOHE S.A. 10.00 255 16,072,621.13 0.00 16,072,621.13 31-05-03 09-02-04 15,862,135.12 0.00 15,862,135.12 1,586,213.51 3.5 453,203.86

17 Carretera Tingo María - Aguaytía, Tr. 1.1: TingoMaría - Pte. Pumahuasi

Consorcio Pumahuasi (CASA - ARAMSA) 15.20 258 16,327,794.90 0.00 16,327,794.90 13-04-04 26-12-04 16,384,597.94 0.00 16,384,597.94 1,077,934.08 3.5 307,981.16

18 Carretera Chamaya - Jaén - Sn. Ignacio - RíoCanchis, Tr. 2: Pte. Tamborapa - Acceso PuertoCiruelo

Corporación Sagitario S.A. 25.08 440 21,266,893.73 0.00 21,266,893.73 27-04-04 10-07-05 23,524,732.15 0.00 23,524,732.15 937,987.73 3.5 267,996.49

929.93 857,755,570.23 4,592,630.95 871,579,389.39 563,651,379.35 202,841,934.95 1,262,606,962.53 1,436,971.87 421,244.57FUENTE MTC, TIPO DE CAMBIO SUNAT CARRETERA CON INDICIOS DE SOBREVALORACION

.COSTO XKM

COMPONENTES TOTALENNS COMPONENTES COSTO TOTAL ENNS

TOTALES

ITEM PROYECTO CONTRATISTA

LONGKM

MONTOCONTRACTUAL

INICIO TÉRMINO

COSTO FINAL