“AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES EN LA LOCALIDAD DE SANTA FE, DISTRITO DE CHINCHEROS , PROVINCIA DE
CHINCHEROS-APURIMAC ”
CALCULO DE ARMADURA DE RESERVORIO
DATOS
PROYECTO : ACERO MUROS
EXPEDIENTE : ACERO VERTICAL = 1/2 Pulg.
ZONAL : APURIMAC DIAMETRO = 1.270 Cms.
EVALUADOR : AREA = 1.267 Cms2.
FECHA : 26-Jan-16 PESO = 0.994 Kg/ml
ACERO HORIZONTAL = 1/2 Pulg.
DIAMETRO = 1.270 Cms.
CARACTERISTICAS GEOMETRICAS AREA = 1.267 Cms2.
VOLUMEN RESERVORIO = 5.00 m3 PESO = 0.994 Kg/ml
ALTURA UTIL RESERVORI = 1.25 mts.
LADO UTIL RESERVORIO = 2.00 mts. ACERO LOSA DE TECHO
ESPECIFICACIONES ACERO HORIZONTAL = 1/2 Pulg.
CONCRETO f'c = 210 Kg/cm2 DIAMETRO = 1.270 Cms.
SOBRECARGA EN LOSA = 150 Kg/m2 AREA = 1.267 Cms2.
ACERO fy = 4,200 Kg/cm2 PESO = 0.994 Kg/ml
RESISTENCIA DEL SUELO = 1.00 Kg/cm2 ACERO LOSA DE FONDO
COEF. SISMICO = 0.12 ACERO HORIZONTAL = 1/2 Pulg.
RECUBRIMIENTO r = = 4.00 Cm DIAMETRO = 1.270 Cms.
fs = 2,100 Kg/cm2 AREA = 1.267 Cms2.
fc = 94.5 Kg/cm2 PESO = 0.994 Kg/ml
0.20 0.15 1.00
1.35
1.35
Sc Wc
SL 0.10
A' B'
0.30
WL NIVEL DE AGUA
S1
1.25
Ea
1.85 1.80 W1 0.42
0.98 Wa
A B
S2 0.20
0.10
C D
W2
0.28
0.68
0.85
“AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES EN LA LOCALIDAD DE SANTA FE, DISTRITO DE CHINCHEROS , PROVINCIA DE
CHINCHEROS-APURIMAC ”
CALCULOS
W1= Pc x V1 558.00 Kg
W2 = Pc x V2 648.00 Kg
Wa = Pa x Va 1250.00 Kg
WL = Pc x VL 276.00 Kg
Ws = Sc x A 172.50 Kg
S1 = 0,12 x W1 100.44 Kg
S2 = 0,12 x W2 116.64 Kg
SL = 0,12 x WL 49.68 Kg
Ss = 0,12 x Ws 37.26 Kg
Ea = 1,12 x 0,5 x Pa x H12 1312.50 Kg
VERIFICACION DEL ESFUERZO CORTANTE EN LA BASE AB
V = Fh / A 1.00 Kg/cm2
Vc = 0,29 ( f'c )^1/2 4.20 Kg/cm2
V= 1.00 Kg/cm2 < Vc = 4.20 Kg/cmBIEN !!
CALCULO DE LA ARMADURA
ACERO VERTICAL CARA B'-B
MOMENTO MAXIMO EN LA BASE A-B
Mu 765.68 Kg-mts.
d = t1 - r - D/2 10.37 Cms.
AREA DE ACERO
As1 = 86.10 Cms2
As2 = 2.00 Cms2 SE ASUME : 2.00 Cms2
CUANTIA = As / t1 x b 0.0013
CUANTIA MINIMA POR FLEXION 0.0012 < 0.0013 BIEN!!
USAR : 1 1/2 @ 0.30 mts.
ACERO HORIZONTAL B'B
ASUMIR CUANTIA MINIMA PARA EL ACERO HORIZONTAL, CONSIDERANDO P = 0,0018
As = P x b x t1 2.70 Cms2
USAR : 1 1/2 @ 0.30 mts.
ACERO EN LA ZAPATA
ASUMIR EL AREA DE ACERO HALLADA PARA LA BASE DE MURO
USAR : 1 1/2 @ 0.30 mts.
ACERO EN LA LOSA DE FONDO
P1 1904.4
P2 3850.2
P3 3348.00
P4 5248.80
P5 7500.00
LUEGO: 4130.70WuD :
270.00
4400.70
WuL :
Wu :
CALCULO DEL MOMENTO ULTIMO
1194.25 Kg--mts
d = t1 - r - D/2 15.37 Cms.
AREA DE ACERO
As1 = 128.51 Cms2
As2 = 2.09 Cms2 SE ASUME : 2.09 Cms2
CUANTIA = As / t1 x b 0.00104
CUANTIA MINIMA POR FLEXION 0.0012 > 0.0010 MAL!!
USAR : 1 1/2 @ 0.25 mts.
ACERO EN LA LOSA DE TECHO
360
WuL = SC * 1,8 270
Wu = 630
CALCULO DEL MOMENTO ULTIMO
120.71 Kg--mts
d = t1 - r - D/2 5.50 Cms.
AREA DE ACERO
As1 = 46.19 Cms2
As2 = 0.59 Cms2 SE ASUME : 0.59 Cms2
CUANTIA = As / t1 x b 0.00059
CUANTIA MINIMA POR FLEXION 0.0012 > 0.0006 MAL!! SE ASUME CUANTIA MINIMA P= 0.0012
As = P * t1 * b 1.20 Cms2
USAR : 1 1/2 @ 0.25 mts
Mu = 0,0513 * Wu * L2
WuD = 2400 * t1 * 1,5
Mu = 0,0479 * Wu * L2
2.70
0.15 0.30
0.20 0.15 TUB. F°G° Ø 3/4"
@ 0,30 Mts.
0.15
1.5 UNIONES
ELECTROSOLDADAS
0.10
2.00
ESCALINES F°G°
VER DETALLE DETALLE DE ESCALINES
BUZON 0,60 x 0,60 Mts.
TAPA SANITARIA METALICA
ESPECIFICACIONES TECNICAS
0.15 RESISTENCIA DEL CONCRETO f'c = 175 Kg/cm2
FLUENCIA DEL ACERO fy = 4200 Kg/cm2
0.20 TRASLAPE MINIMO DE VARILLAS = 30 cm
0.20 0.15 2.00 0.15 0.20
TAPA SANITARIA METALICA 1/2 @ 0.25
0,60 x 0,60 mts.
0.10
ユ ユ ユ ユ ユ ユ ユ ユ ユユ ユ
0.30
NIVEL DE AGUA
ユ 1/2 @ 0.30 ユ
1/2 @ 0.30 TARRAJEO C / IMPERMEABILIZANTE 1.55
ユ ユ1.25
1/2 @ 0.30
ユ ユ 1/2 @ 0.25 PENDIENTE DE FONDO 1%
1/2 @ 0.30
ユ ユユ ユ ユ ユ ユ ユ ユ ユ ユ
0.20
ユ ユ ユ ユ ユ ユ ユ ユ0.075
0.67 SOLADO DE CONCRETO
0.20 0.15 2.00 0.15 0.20
TUBERIA DE VENTILACION F°G° ø 2"
1/2 @ 0.25
2.30
2 Ø 3/8
2.30
PLANILLA DE ARMADURA RESERVORIO 5 M3
ARMADURA LOSA DE TECHO LONGITUD VECES PESO
2.24
0.07 1/2 2.38 17 40.22
2.24
3/8 2.24 4 8.91
ARMADURA LOSA DE FONDO LONGITUD VECES PESO
1.02
0.17 1/2 1.19 40.00 47.18
2.64
1/2 2.64 13.00 34.11
ARMADURA DE MURO LONGITUD VECES PESO
0.11
1.71 1/2 1.93 34.00 65.23
0.152.15 1/2 4.75 14.00 66.10
1.15
PESO TOTAL EN Kg 261.75
HOJA DE METRADOS DE RESERVORIO
CAPACIDAD : 5 M3
PROYEC.: EVALUADOR:
EXPED.: 0 FECHA: 1/26/2016
PARTIDA DESCRIPCION VECES LONG. ANCHO ALTURA SUB-TOTAL TOTAL UNID.
3.00 RESERVORIO 5.00 M3
03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA MANUAL DEL TERRENO 1.00 2.70 2.70 7.29 7.29 m2
03.01.02 TRAZO Y REPLANTEO 1.00 2.70 2.70 7.29 7.29 m2
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION MANUAL 1.00 2.70 2.70 0.80 5.83 5.83 m3
03.02.02 REFINE,NIVELACION Y COMPACTACION 1.00 2.25 2.25 5.06 5.06 m2
03.02.03 ELIMINACION DE MATERIAL DE CORTE EN BUGGIE 1.00 2.70 2.70 0.80 5.83 5.83 m3
03.03 OBRAS DE CONCRETO SIMPLE
03.03.01 CONCRETO F'C=140KG/CM^2 PARA SOLADO 1.00 2.70 2.70 7.29 7.29 m2
03.04 OBRAS DE CONCRETO ARMADO
03.04.01 CONCRETO F'C= 210 KG/CM2 1.00 2.70 2.70 0.20 1.46 3.99 m3
2.00 2.30 0.15 1.55 1.07 m3
2.00 2.00 0.15 1.55 0.93 m3
1.00 2.30 2.30 0.10 0.53 m3
03.04.02 ACERO FY= 4,200 KG/CM2 1.00 261.75 261.75 261.75 kg
03.04.03 ENCOFRADO Y DESENCOFRADO 4.00 2.30 1.65 15.18 31.58 m2
4.00 2.00 1.55 12.40 m2
1.00 2.00 2.00 4.00 m2
03.05 REVOQUES ENLUCIDOS Y MOLDADURAS
03.05.01 TARRAJEO INTERIOR CON IMPERMEABILIZANTE 4.00 2.00 1.55 12.40 16.40 m2
1.00 2.00 2.00 4.00 m2
03.05.02 TARRAJEO EXTERIOR MEZCLA 1:5 4.00 2.30 1.65 15.18 20.47 m2
1.00 2.30 2.30 5.29 m2
03.06 PINTURA
03.06.01 PINTADO DE MUROS EXTERIORES 4.00 2.30 1.65 15.18 m2
1.00 2.30 2.30 5.29
03.07 OTROS
03.07.01 HIPOCLORADOR DE DE FLUJO DE DIFUSION 1.00 1.00 1.00 unid
03.07.02 TAPA METALICA REFORZADA 3/16 D=0.60 m 1.00 1.00 1.00 unid
03.07.03 INST. ACCESORIOS TUBERIA DE VENTILACION F°G° D= 2 1.00 1.00 1.00 unid
03.07.04 ESCALERA TUBERIA F°G° DE 1" 2.00 2.05 4.10 5.30 ml
4.00 0.30 1.20
03.08 CAJA DE OPERACIÓN DE VALVULAS
03.08.01 CAJA DE OPERACIÓN DE VALVULAS
TRABAJOS PRELIMINARES
LIMPIEZA MANUAL DEL TERRENO 1 1 1.4 1.4 1.40 m203.08.01 TRAZO Y REPLANTEO 1 1 1.4 1.4 1.40 m3
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL 1 1 1.4 0.8 1.12 1.12 m3REFINE, NIVELACION Y COMPACTACION
03.08.01 ELIMINACION DE MATERIAL DEMOLIDO EN BUGUI D = 100m
OBRAS DE CONCRETO SIMPLE
03.08.01 CONCRETO F'C 100KG/CM^2 1 1 1.4 1.4 1.40 m2OBRAS DE CONCRETO ARMADO
CONCRETO F'C 210 KG/CM^2 1 1 1.4 0.15 0.21 0.61 m32 1.1 0.1 0.8 0.174
03.08.01 2 0.2 0.1 0.051 1 0.1 0.8 0.081 1 1 0.1 0.0641 0.6 0.6 0.14 0.66 0.05 0.6 0.0792
03.08.01 ACERO FY= 4,200 KG/CM2 1 24.75 24.75 kgENCOFRADO Y DESENCOFRADO 2 1 0.15 0.3 6.27 m2
1 1.4 0.15 0.212 1.1 0.8 1.761 1.2 0.8 0.962 1 0.8 1.61 1 0.8 0.81 1 1 0.641 0.6 0.6
03.09 REVOQUES ENLUCIDOS Y MOLDADURAS
03.09.01 TARRAJEO CON MORTERO CEMENTO/ARENA 1:1 1 3.2 0.1 0.32 7.52 m22 1.1 0.8 1.761 1.2 0.8 0.962 1 0.8 1.61 1 0.8 0.8
Interior caja de valvulas 1 1 0.8 0.82 1 1 1.282 0.6 0.6
03.09.01 PINTURA
PINTURA EXTERIOR C/LATEX + IMPRIMANTE 3.68 m21 3.2 0.1 0.32 m22 1.1 0.8 1.761 1.2 0.8 0.961 1 1 0.641 0.6 0.6
03.09.01
OTROS
SUMINISTRO Y COLOCACION DE DE TUBERIA (C-10) 2" 1 1.00 undPRUEBA HIDRAULICA 1 1.00 und
03.09.01
CERCO PERIMETRICO DE PROTECCION DEL RESERVORIO
TRABAJOS PRELIMINARES
LIMPIEZA,DEFORESTACION Y ELIMINACION DE MATERI 1 19.22 0.5 9.61 9.61 m2TRAZO Y REPLANTEO PRELIMINAR 1 19.22 0.5 9.61 9.61 m2
03.09.01 MOVIMIENTO DE TIERRAS EXCAVACION PARA ZAPATAS Y CIMIENTOS CORRIDOS 9 0.3 0.3 0.45 0.3645 0.36 m3
03.09.01 ELIMINACIONDE MATERIAL EXCEDENTE EN CARRETILLA 9 0.3 0.3 0.45 0.3645 0.36 m3CONCRETO SIMPLE CONCRETO FC 175 KG/CM^2 9 0.3 3 0.45 3.645 3.65 m3ENCOFRADO Y DESENCOFRADO 9 0.3 0.3 0.2 0.162 0.16 m2CERCO DE SEGURIDAD COLOCACION POSTES DE 2" e=3/16" 9 9 9.00 undPANELES DE MALLA METALICA N°10 CON MARCO METALI 1 18.47 1.8 33.25 33.25 m2
PUERTA 1 1.00 1.00 und
PINTURA PINTURA EN POSTES DE 2" Y ANGULARES DE 1 1/2" 9 9 9.00 und
VOLUMEN ALTURA LADO INTER VOLUMEN ASUMIDO
3.00 1.25 1.55 5.00 M34.00 1.25 1.80
5.00 1.25 2.00 ALTURA LADO
6.00 1.25 2.20 1.25 2.007.00 1.25 2.40
8.00 1.30 2.50
9.00 1.30 2.65
10.00 1.35 2.75
11.00 1.40 2.85
12.00 1.45 2.90
13.00 1.50 2.95
14.00 1.55 3.05
15.00 1.55 3.15
16.00 1.60 3.20
17.00 1.65 3.25
18.00 1.65 3.35
19.00 1.70 3.35
20.00 1.70 3.45
21.00 1.75 3.50
22.00 1.75 3.55
23.00 1.80 3.60
24.00 1.85 3.65
25.00 1.85 3.70
26.00 1.85 3.75
27.00 1.90 3.80
28.00 1.90 3.85
29.00 1.95 3.90
30.00 1.95 3.95
31.00 2.00 3.95
32.00 2.00 4.00
33.00 2.05 4.05
34.00 2.05 4.10
35.00 2.05 4.15
36.00 2.10 4.15
37.00 2.10 4.20
38.00 2.15 4.25
39.00 2.15 4.30
40.00 2.15 4.35
41.00 2.20 4.35
42.00 2.20 4.40
43.00 2.20 4.45
44.00 2.25 4.45
45.00 2.25 4.50
46.00 2.25 4.55
47.00 2.30 4.55
48.00 2.30 4.60
49.00 2.30 4.65
50.00 2.35 4.65
51.00 2.35 4.70
52.00 2.45 4.65
53.00 2.40 4.70
54.00 2.40 4.75
55.00 2.40 4.80
56.00 2.40 4.85
57.00 2.45 4.85
58.00 2.45 4.90
59.00 2.55 4.85
60.00 2.45 4.95
Hoja9
Página 17
ACERO
1 0.15 1.4 8 11.21.4 0.15 1.2 11 13.21.1 0.15 0.8 9 7.21.1 0.15 1 9 91.2 0.15 1 9 91.2 0.15 1 9 90.8 0.15 1.2 7 8.40.8 0.15 1.2 7 8.40.8 0.15 1.2 7 8.40.4 0.15 2.3 4 9.20.6 0.15 1.2 5 6
SUMA 99 0.25 24.75
Hoja11
Página 18
ACERO
VECES1 0.94 1.40 0.30 61 1.34 1.00 0.30 51 0.99 1.40 0.30 61 1.34 1.05 0.30 52 0.99 1.20 0.30 52 1.14 1.05 0.30 52 1.48 22 1.28 21 1.48 0.60 0.20 41 1.28 0.80 0.20 51 0.88 0.60 0.20 41 0.68 0.60 0.20 4
Hoja11
Página 19
5.64 0.56 3.15846.7 0.56 3.752
5.94 0.56 3.32646.7 0.56 3.7529.9 0.56 5.544
11.4 0.56 6.3845.92 0.56 3.31525.12 0.56 2.86725.92 0.56 3.3152
6.4 0.56 3.5843.52 0.56 1.97122.72 0.56 1.5232
SUMA 42.4928
Hoja12
Página 20
PARTIDA DESCRIPCION VECES LONG. ANCHO
CAJA DE OPERACIÓN DE VALVULAS
03.08.01 TRABAJOS PRELIMINARES
LIMPIEZA MANUAL DEL TERRENO 1 1.2 1.4TRAZO Y REPLANTEO 1 1.2 1.4
03.08.01 MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL 1 1.2 1.4REFINE, NIVELACION Y COMPACTACION
ELIMINACION DE MATERIAL DEMOLIDO EN BUGUI D = 100m
03.08.01 OBRAS DE CONCRETO SIMPLE
CONCRETO F'C 100KG/CM^2 1 1.2 1.403.08.01 OBRAS DE CONCRETO ARMADO
CONCRETO F'C 210 KG/CM^2 1 1 1.42 1.2 0.81 1.4 0.81 1.2 1.4
ACERO FY= 4,200 KG/CM2 1ENCOFRADO Y DESENCOFRADO 2 1.2
1 1.42 1.251 1.251 1.2 1.4
03.08.01 REVOQUES ENLUCIDOS Y MOLDADURAS
TARRAJEO CON MORTERO CEMENTO/ARENA 1:1 2 1.21 1.41 1.2 1.4
03.08.01 PINTURA
PINTURA EXTERIOR C/LATEX + IMPRIMANTE 2 1.21 1.41 1.2 1.4
03.08.01 OTROS
SUMINISTRO Y COLOCACION DE DE TUBERIA (C-10) 2" 1PRUEBA HIDRAULICA 1
03.09 CERCO PERIMETRICO DE PROTECCION DEL RESERVORIO
03.09.01 TRABAJOS PRELIMINARES
LIMPIEZA,DEFORESTACION Y ELIMINACION DE MATERIAL ORGANIC 1 5.05 3.85TRAZO Y REPLANTEO PRELIMINAR 1 5.05 3.85
03.09.01 MOVIMIENTO DE TIERRAS
EXCAVACION PARA ZAPATAS Y CIMIENTOS CORRIDOS 9 0.3 0.3ELIMINACIONDE MATERIAL EXCEDENTE EN CARRETILLAS 9 0.3 0.3
03.09.01 CONCRETO SIMPLE
CONCRETO FC 175 KG/CM^2 9 0.3 3ENCOFRADO Y DESENCOFRADO 9 0.3 0.3
03.09.01 CERCO DE SEGURIDAD
COLOCACION POSTES DE 2" e=3/16" 9PANELES DE MALLA METALICA N°10 CON MARCO METALICO L=3.00 1 5.05 3.85PUERTA 1
03.09.01 PINTURA
PINTURA EN POSTES DE 2" Y ANGULARES DE 1 1/2" 903.09.01 INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS PARA RESERVORIO
Hoja12
Página 21
ALTURA SUB-TOTAL TOTAL UNID.
1.68 1.68 m21.68 1.68 m3
0.8 1.344 1.34 m3
1.68 1.68 m2
0.15 0.21 0.69 m30.15 0.1440.15 0.168
0.1 0.16842.49 42.49 kg
1.05 1.26 6.49 m21.05 1.471.05 1.3125
0.9 1.1251.68
1.05 1.26 4.05 m21.05 1.47
1.68
1.05 1.26 4.05 m21.05 1.47
1.68
1.00 und1.00 und
19.4425 19.44 m219.4425 19.44 m2
0.45 0.0405 0.04 m30.45 0.0405 0.04 m3
0.45 0.405 0.41 m3
0.2 0.018 0.02 m2
9 9.00 und19.44 19.44 m2
1.00 1.00 und
9 9.00 und