CALCULO DE REDES DE DISTRIBUCION DE AGUA POTABLE: SANTA FE (WATER CAD) PROYECTO: FECHA: : MAYO 2013 DATOS DE DISEÑO Poblacion Futura = 881 habitantes QmH = 2.76 Lt/seg Factor de gasto = 0.003133 Lt/seg/Hab. TUBERIA NUDO MATERIAL COTA PIEZOMETRICA COTA DE TERRENO PRES INICIO FIN INICIAL FINAL INICIAL FINAL INICIAL P-21 J-1 J-2 15.63 29.4 PVC 150 0.19 0.28 884.57 884.52 845.50 845.60 39.07 P-7 J-3 J-4 22.46 29.4 PVC 150 -0.02 0.03 884.93 884.93 862.40 856.30 22.53 P-33 J-5 J-6 24.17 29.4 PVC 150 0.02 0.03 884.46 884.46 837.50 835.50 46.96 P-9 J-7 J-8 25.66 29.4 PVC 150 0.30 0.44 885.20 884.99 857.50 865.80 27.70 P-14 J-9 J-10 25.87 29.4 PVC 150 0.03 0.04 884.76 884.76 847.40 847.10 37.36 P-25 J-11 J-12 26.96 29.4 PVC 150 0.18 0.27 884.57 884.48 844.00 841.00 40.57 P- 4 J-13 J-2 28.91 29.4 PVC 150 -0.14 0.21 884.46 884.48 841.00 841.00 43.46 P-10 J-8 J-10 29.68 29.4 PVC 150 0.28 0.41 884.99 884.76 865.80 847.10 19.19 P-12 J-4 J-14 29.78 29.4 PVC 150 0.25 0.36 884.93 884.75 856.30 847.90 28.63 P-20 J-1 J-11 29.98 29.4 PVC 150 -0.02 0.02 884.57 884.57 845.50 844.00 39.07 P-11 J-7 J-9 30.88 29.4 PVC 150 0.39 0.58 885.20 884.76 857.50 847.40 27.70 P-16 J-14 J-15 31.47 29.4 PVC 150 0.22 0.33 884.75 884.60 847.90 847.20 36.85 P-15 J-14 J-9 31.69 29.4 PVC 150 -0.05 0.07 884.75 884.76 847.90 847.40 36.85 P-8 J-7 J-4 31.72 29.4 PVC 150 0.30 0.44 885.20 884.93 857.50 856.30 27.70 P-28 J-16 J-13 31.73 29.4 PVC 150 -0.01 0.02 884.45 884.46 836.60 841.00 47.85 P-29 J-12 J-5 32.33 29.4 PVC 150 0.07 0.11 884.48 884.46 841.00 837.50 43.48 P-18 J-9 J-1 32.75 29.4 PVC 150 0.24 0.36 884.76 884.57 847.40 845.50 37.36 P-17 J-17 J-15 33.93 29.4 PVC 150 -0.15 0.22 884.51 884.60 846.30 847.20 38.21 P-19 J-10 J-11 34.97 29.4 PVC 150 0.23 0.34 884.76 884.57 847.10 844.00 37.66 P-23 J-18 J-17 36.1 29.4 PVC 150 -0.11 0.16 884.47 884.51 837.80 846.30 46.67 P-3 J-19 J-20 37.92 29.4 PVC 150 -1.08 1.59 891.56 895.05 874.10 884.00 17.46 P-24 J-16 J-21 41.42 29.4 PVC 150 0.02 0.03 884.45 884.45 836.60 834.45 47.85 P-30 J-16 J-5 45 29.4 PVC 150 -0.04 0.05 884.45 884.46 836.60 837.50 47.85 AMPLIACIÓN Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA COMUNIDAD DE SANTA FE DEL CENTRO POBLADO DE PROGRESO, DISTRITO PROVINCIA DE LA CONVENCIÓN - CUSCO LONGITUD (m) DIAMETRO (mm) Hazen- Williams C CAUDAL (l/s) VELOCIDAD (m/s)

Calculos Redes

Embed Size (px)

DESCRIPTION

SDS

Citation preview

Page 1: Calculos Redes

CALCULO DE REDES DE DISTRIBUCION DE AGUA POTABLE: SANTA FE (WATER CAD)

PROYECTO:

FECHA: : MAYO 2013

DATOS DE DISEÑO

Poblacion Futura = 881 habitantes QmH = 2.76 Lt/seg Factor de gasto = 0.003133 Lt/seg/Hab.

TUBERIANUDO

LONGITUD (m) MATERIAL CAUDAL (l/s)COTA PIEZOMETRICA COTA DE TERRENO PRESION

INICIO FIN INICIAL FINAL INICIAL FINAL INICIAL FINAL

P-21 J-1 J-2 15.63 29.4 PVC 150 0.19 0.28 884.57 884.52 845.50 845.60 39.07 38.92

P-7 J-3 J-4 22.46 29.4 PVC 150 -0.02 0.03 884.93 884.93 862.40 856.30 22.53 28.63

P-33 J-5 J-6 24.17 29.4 PVC 150 0.02 0.03 884.46 884.46 837.50 835.50 46.96 48.96

P-9 J-7 J-8 25.66 29.4 PVC 150 0.30 0.44 885.20 884.99 857.50 865.80 27.70 19.19

P-14 J-9 J-10 25.87 29.4 PVC 150 0.03 0.04 884.76 884.76 847.40 847.10 37.36 37.66

P-25 J-11 J-12 26.96 29.4 PVC 150 0.18 0.27 884.57 884.48 844.00 841.00 40.57 43.48

P- 4 J-13 J-2 28.91 29.4 PVC 150 -0.14 0.21 884.46 884.48 841.00 841.00 43.46 43.48

P-10 J-8 J-10 29.68 29.4 PVC 150 0.28 0.41 884.99 884.76 865.80 847.10 19.19 37.66

P-12 J-4 J-14 29.78 29.4 PVC 150 0.25 0.36 884.93 884.75 856.30 847.90 28.63 36.85

P-20 J-1 J-11 29.98 29.4 PVC 150 -0.02 0.02 884.57 884.57 845.50 844.00 39.07 40.57

P-11 J-7 J-9 30.88 29.4 PVC 150 0.39 0.58 885.20 884.76 857.50 847.40 27.70 37.36

P-16 J-14 J-15 31.47 29.4 PVC 150 0.22 0.33 884.75 884.60 847.90 847.20 36.85 37.40

P-15 J-14 J-9 31.69 29.4 PVC 150 -0.05 0.07 884.75 884.76 847.90 847.40 36.85 37.36

P-8 J-7 J-4 31.72 29.4 PVC 150 0.30 0.44 885.20 884.93 857.50 856.30 27.70 28.63

P-28 J-16 J-13 31.73 29.4 PVC 150 -0.01 0.02 884.45 884.46 836.60 841.00 47.85 43.46

P-29 J-12 J-5 32.33 29.4 PVC 150 0.07 0.11 884.48 884.46 841.00 837.50 43.48 46.96

P-18 J-9 J-1 32.75 29.4 PVC 150 0.24 0.36 884.76 884.57 847.40 845.50 37.36 39.07

P-17 J-17 J-15 33.93 29.4 PVC 150 -0.15 0.22 884.51 884.60 846.30 847.20 38.21 37.40

P-19 J-10 J-11 34.97 29.4 PVC 150 0.23 0.34 884.76 884.57 847.10 844.00 37.66 40.57

P-23 J-18 J-17 36.1 29.4 PVC 150 -0.11 0.16 884.47 884.51 837.80 846.30 46.67 38.21

P-3 J-19 J-20 37.92 29.4 PVC 150 -1.08 1.59 891.56 895.05 874.10 884.00 17.46 11.05

P-24 J-16 J-21 41.42 29.4 PVC 150 0.02 0.03 884.45 884.45 836.60 834.45 47.85 50.00

P-30 J-16 J-5 45 29.4 PVC 150 -0.04 0.05 884.45 884.46 836.60 837.50 47.85 46.96

AMPLIACIÓN Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA COMUNIDAD DE SANTA FE DEL CENTRO POBLADO DE PROGRESO, DISTRITO DE KIMBIRI, PROVINCIA DE LA CONVENCIÓN - CUSCO

DIAMETRO (mm)

Hazen- Williams C

VELOCIDAD (m/s)

Page 2: Calculos Redes

CALCULO DE REDES DE DISTRIBUCION DE AGUA POTABLE: SANTA FE (WATER CAD)

PROYECTO:

FECHA: : MAYO 2013

DATOS DE DISEÑO

Poblacion Futura = 881 habitantes QmH = 2.76 Lt/seg Factor de gasto = 0.003133 Lt/seg/Hab.

TUBERIANUDO

LONGITUD (m) MATERIAL CAUDAL (l/s)COTA PIEZOMETRICA COTA DE TERRENO PRESION

INICIO FIN INICIAL FINAL INICIAL FINAL INICIAL FINAL

AMPLIACIÓN Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO EN LA COMUNIDAD DE SANTA FE DEL CENTRO POBLADO DE PROGRESO, DISTRITO DE KIMBIRI, PROVINCIA DE LA CONVENCIÓN - CUSCO

DIAMETRO (mm)

Hazen- Williams C

VELOCIDAD (m/s)

P-26 J-13 J-12 45.21 29.4 PVC 150 -0.07 0.11 884.46 884.48 841.00 841.00 43.46 43.48

P-27 J-22 J-13 50.64 29.4 PVC 150 -0.07 0.11 884.42 884.46 840.10 841.00 44.32 43.46

P-22 J-2 J-17 53.07 29.4 PVC 150 0.01 0.02 884.52 884.51 845.60 846.30 38.92 38.21

P-32 J-18 J-23 57.51 29.4 PVC 150 0.04 0.05 884.47 884.46 837.80 839.00 46.67 45.46

P-31 J-16 J-18 66.89 29.4 PVC 150 -0.04 0.06 884.45 884.47 836.60 837.80 47.85 46.67

P-6 J-19 J-7 73.65 29.4 PVC 150 1.04 1.54 891.56 885.20 874.10 857.50 17.46 27.70

P-5 J-19 J-24 238.94 29.4 PVC 150 0.02 0.03 891.56 891.55 874.10 858.00 17.46 33.55

P-4 J-20 J-25 243.69 29.4 PVC 150 0.04 0.05 895.05 895.01 884.00 882.40 11.05 12.61P-1 R-1 PRV-1 98.99 43.4 PVC 150 1.12 0.77 940.87 939.38 940.87 895.87 0.00 43.51P-2 PRV-1 J-20 54.24 43.4 PVC 150 1.12 0.77 939.38 895.05 895.87 884.00 43.51 11.05

Page 3: Calculos Redes

Ø 1" Ø 3/4"

22.46

24.17

25.66

29.98

30.88

31.47

31.69

139.77 56.54

Page 4: Calculos Redes

CAUDAL DE DEMANDA EN LOS NUDOS

DATOS DE DISEÑO

Poblacion Futura = 881 habitantes QmH = 2.76 Lt/seg

Factor de gasto = 0.003133 Lt/seg/Hab.

NUDO VIVIENDAS POBLACION CAUDAL

1 1 6 0.019

2 3 18 0.056

3 2 12 0.038

4 6 36 0.113

5 8 48 0.150

6 2 12 0.038

7 2 12 0.038

8 2 12 0.038

9 26 156 0.489

10 5 30 0.094

11 4 24 0.075

12 6 36 0.113

13 6 36 0.113

14 2 12 0.038

15 9 54 0.169

16 9 54 0.169

17 4 24 0.075

18 2 12 0.038

19 9 54 0.169

20 6 36 0.113

21 6 36 0.113

22 15 90 0.282

23 2 12 0.038

24 1 6 0.019

25 1 6 0.019

26 1 6 0.019

27 1 6 0.019

28 1 6 0.019

29 1 6 0.019

30 2 12 0.038

31 2 12 0.038

147 882 2.763

Page 5: Calculos Redes

TUBERIANUDO

LONGITUD (m)INICIO FIN

P-21 J-1 J-2 15.63

P-7 J-3 J-4 22.46

P-33 J-5 J-6 24.17

P-9 J-7 J-8 25.66

P-14 J-9 J-10 25.87

P-25 J-11 J-12 26.96

P- 4 J-13 J-2 28.91

P-10 J-8 J-10 29.68

P-12 J-4 J-14 29.78

P-20 J-1 J-11 29.98

P-11 J-7 J-9 30.88

P-16 J-14 J-15 31.47

P-15 J-14 J-9 31.69

P-8 J-7 J-4 31.72

P-28 J-16 J-13 31.73

P-29 J-12 J-5 32.33

P-18 J-9 J-1 32.75

P-17 J-17 J-15 33.93

P-19 J-10 J-11 34.97

P-23 J-18 J-17 36.1

P-3 J-19 J-20 37.92

P-24 J-16 J-21 41.42

P-30 J-16 J-5 45

P-26 J-13 J-12 45.21

P-27 J-22 J-13 50.64

P-22 J-2 J-17 53.07

P-32 J-18 J-23 57.51

P-31 J-16 J-18 66.89

P-6 J-19 J-7 73.65

P-5 J-19 J-24 238.94

P-4 J-20 J-25 243.69P-1 R-1 PRV-1 98.99P-2 PRV-1 J-20 54.24

Page 6: Calculos Redes

Ø 1" Ø 3/4"

22.46

24.17

25.66

29.98

30.88

31.47

31.69

139.77 56.54