RESISTENCIA A LA COMPRESION DE TESTIGOS CILINDRICOS DE CONCRETO NORMA ASTM C-39/ AASHTO T22 Informe: Obra: Ubicación: Fecha: ºº ENSAYO DE ROTURAS DE PROBETAS DE CONCRETO DESCRIPCION EJES SECTOR FECHA DE MUESTREO Fecha de Rotura Carga en KN Carga en Kg 124 contra piso b2 1NIVEL 6/12/2013 7 6/19/2013 15.20 181.5 1940 19782.5 140 125 E 1NIVEL 6/13/2013 7 6/20/2013 15.15 180.3 2500 25492.9 100 126 E 1NIVEL 6/13/2013 7 6/20/2013 15.10 179.1 2398 24452.8 100 127 E 1NIVEL 6/14/2013 7 6/21/2013 15.10 179.1 2721 27746.5 100 128 E 1NIVEL 6/14/2013 7 6/21/2013 15.10 179.1 2683 27359.0 100 129 b1 1NIVEL 6/14/2013 7 6/21/2013 15.10 179.1 2005 20445.3 100 130 b1 1NIVEL 6/14/2013 7 6/21/2013 15.10 179.1 2103 20623.4 100 131 E 1NIVEL 6/14/2013 7 6/21/2013 15.10 179.1 2323 22780.8 100 85 I 5/27/2013 7 6/3/2013 15.50 188.7 2400 23536.0 175 85 CONTRAPISO PASADISO B1 5/29/2013 7 6/5/2013 15.50 188.7 2400 23536.0 175 86 CONTRAPISO PASADISO B2 5/30/2013 28 6/27/2013 16.50 213.8 2401 23545.8 176 87 CONTRAPISO A2 5/29/2013 7 6/5/2013 16.50 213.8 2401 23545.8 176 88 CONTRAPISO A2 5/29/2013 28 6/26/2013 16.50 213.8 2401 23545.8 176 89 CONTRAPISO A2 5/30/2013 7 6/6/2013 16.50 213.8 2401 23545.8 176 90 CONTRAPISO A2 5/30/2013 28 6/27/2013 17.50 240.5 2402 23555.6 177 91 CONTRAPISO A3 5/30/2013 7 6/6/2013 18.50 268.8 2403 24503.8 178 92 CONTRAPISO A3 5/30/2013 28 6/27/2013 19.50 298.6 2404 23575.2 179 93 cimiento corrido prosenio k 6/4/2013 20.50 330.1 2405 24524.2 180 94 cimiento corrido prosenio k 6/4/2013 21.50 363.1 2406 0.0 181 22 COLUMNETAS - CI 1/21/2013 15.20 181.5 4904 50006.9 175 tipos de falla observaciones 1.-conos bien formados en ambas bases Según las especificaciones tecnicas el diseño de concreto para los Subcimiento y Cimi 2.-base inferior con fracturas es: 3.-base superior con fracturas SUBCIMIENTO : 1:12 4.-falla local en momento de la carga aplicada al testigo 5.-testigo mal testeado 6.-grietas en el perimetro del testigo 7.-testigo mal formados en base superior y inferior Elaborado Revisado Aprobado Nª CODIGO DE PROBETA EDAD DIAS Diámetro (cm) Área de Probeta (cm2) Resistencia de Diseño (Kg/cm2) subcimiento SH publico hombres y mujeres subcimiento SH publico hombres y mujeres sobrecimientoSH publico hombres y mujeres sobrecimientoSH publico hombres y mujeres subcimiento SH publico hombres y mujeres subcimiento SH publico hombres y mujeres subcimiento SH publico y ambiente aire acondicionado MQUINAS GUARDA ROPA DE GUARDA ROPA DE MEDICAMENTOS MEDICAMENTOS INSTRUMENTAL INSTRUMENTAL - CIMIENTO CORRIDO: 1:10

excel probetas

Embed Size (px)

DESCRIPTION

bueno

Citation preview

Page 1: excel probetas

RESISTENCIA A LA COMPRESION DE TESTIGOS CILINDRICOS DE CONCRETO NORMA ASTM C-39/ AASHTO T22

Informe:Obra:Ubicación:Fecha:

ºº

ENSAYO DE ROTURAS DE PROBETAS DE CONCRETO

DESCRIPCION EJES SECTOR Carga en KN Carga en Kg %

124 contra piso b2 1NIVEL 6/12/2013 7 6/19/2013 15.20 181.5 1940 19782.5 140 109 1 78

125 E 1NIVEL 6/13/2013 7 6/20/2013 15.15 180.3 2500 25492.9 100 141 1 141

126 E 1NIVEL 6/13/2013 7 6/20/2013 15.10 179.1 2398 24452.8 100 137 1 137

127 E 1NIVEL 6/14/2013 7 6/21/2013 15.10 179.1 2721 27746.5 100 155 2 155

128 E 1NIVEL 6/14/2013 7 6/21/2013 15.10 179.1 2683 27359.0 100 153 2 153

129 b1 1NIVEL 6/14/2013 7 6/21/2013 15.10 179.1 2005 20445.3 100 114 2 114

130 b1 1NIVEL 6/14/2013 7 6/21/2013 15.10 179.1 2103 20623.4 100 115 3 115

131 E 1NIVEL 6/14/2013 7 6/21/2013 15.10 179.1 2323 22780.8 100 127 2 127

85 I 5/27/2013 7 6/3/2013 15.50 188.7 2400 23536.0 175 125 2 7185 CONTRAPISO PASADISO B1 5/29/2013 7 6/5/2013 15.50 188.7 2400 23536.0 175 125 2 7186 CONTRAPISO PASADISO B2 5/30/2013 28 6/27/2013 16.50 213.8 2401 23545.8 176 110 3 6387 CONTRAPISO A2 5/29/2013 7 6/5/2013 16.50 213.8 2401 23545.8 176 110 3 6388 CONTRAPISO A2 5/29/2013 28 6/26/2013 16.50 213.8 2401 23545.8 176 110 3 6389 CONTRAPISO A2 5/30/2013 7 6/6/2013 16.50 213.8 2401 23545.8 176 110 3 6390 CONTRAPISO A2 5/30/2013 28 6/27/2013 17.50 240.5 2402 23555.6 177 98 4 5591 CONTRAPISO A3 5/30/2013 7 6/6/2013 18.50 268.8 2403 24503.8 178 91 5 5192 CONTRAPISO A3 5/30/2013 28 6/27/2013 19.50 298.6 2404 23575.2 179 79 6 4493 cimiento corrido prosenio k 6/4/2013 20.50 330.1 2405 24524.2 180 74 7 4194 cimiento corrido prosenio k 6/4/2013 21.50 363.1 2406 0.0 181 0 8 022 COLUMNETAS - CI 1/21/2013 15.20 181.5 4904 50006.9 175 276 2 157

tipos de falla observaciones1.-conos bien formados en ambas bases Según las especificaciones tecnicas el diseño de concreto para los Subcimiento y Cimiento Corrido del sector K, 2.-base inferior con fracturas es:3.-base superior con fracturas SUBCIMIENTO : 1:124.-falla local en momento de la carga aplicada al testigo

5.-testigo mal testeado

6.-grietas en el perimetro del testigo

7.-testigo mal formados en base superior y inferior

Elaborado Revisado Aprobado

Nª CODIGO DE PROBETA

FECHA DE MUESTREO

EDAD DIAS

Fecha de Rotura

Diámetro (cm)

Área de Probeta (cm2)

Resistencia de Diseño

(Kg/cm2)

Resistencia del Concreto (Kg/cm2)

tipo de falla

subcimiento SH publico hombres y mujeres

subcimiento SH publico hombres y mujeres

sobrecimientoSH publico hombres y mujeres

sobrecimientoSH publico hombres y mujeres

subcimiento SH publico hombres y mujeres

subcimiento SH publico hombres y mujeres

subcimiento SH publico y ambiente aire acondicionado

ESCALERA CUARTO DE MQUINAS

SALA ENTREVISTA - SERVICIO SOCIAL - GUARDA ROPA DE

PACIENTES

SALA ENTREVISTA - SERVICIO SOCIAL - GUARDA ROPA DE

PACIENTES

ALMACENAMIENTO DE

MEDICAMENTOS

ALMACENAMIENTO DE

MEDICAMENTOS

DEPOSITO DE INSTRUMENTAL

MEDICO

DEPOSITO DE INSTRUMENTAL

MEDICO

- CIMIENTO CORRIDO: 1:10